Home improvement must know three levels when it comes to full acceptance.

For homes that are put into renovations, the acceptance of home improvement must be put on the agenda. The home improvement supervision engineer proposed that the quality of the renovation project will directly affect the quality of the home life in the future. Only the acceptance check at all stages will enable the home to be reassuring. Many consumers think that acceptance is just a matter of completion after renovation. In fact, acceptance requires a good three-phase pass to be able to do the entire process without worry.

Basics

Acceptance of materials

The first step in acceptance work is acceptance of the material. When signing a contract with a customer, a formal decoration company will sign a material declaration sheet at the same time, detailing the brands, specifications, and quality levels of the required materials. Both parties shall check the materials according to the material specification. Due to the limited space at the construction site, the material will be checked and accepted several times. In general, the materials to be inspected before construction include pipes, wires, planks, putties, cement, sand, etc., and ceramics, paints, and coatings will be gradually accepted as the project progresses.

The time of acceptance of the agreed materials: After the materials are purchased, the purchaser shall notify the Other party to the contract to prepare for the acceptance of the materials, preferably when the materials enter the market. The agreed acceptance time is very necessary to avoid material entry, the other party does not have time to accept the material, affecting the construction progress.

The acceptance person stipulated in the contract must be on the scene: both the person in the home improvement industry and the consumer should take it seriously so as to avoid unnecessary troubles or disputes later.

The acceptance procedure shall be strict: the inspector shall conduct necessary inspections for each material agreement stipulated in the contract, such as brand, quality, specification and quantity.

The inspector specified in the contract shall sign the acceptance checklist: If the inspection result material is qualified, the inspector shall sign the material acceptance checklist. If the owner finds that the entry materials are inconsistent with the contractual requirements, he may refuse to sign the material acceptance form until he negotiates with the home improvement company for resolution.

Defense off

Key acceptance of hidden works

The supervising engineer introduced that when the concealment project is carried out or completed, it is necessary to carry out a mid-term key acceptance. This is particularly important for ensuring the overall quality of home improvement. The acceptance of the concealed project will affect the performance of multiple home improvement projects in the later period. General home improvement can be carried out about 15 days for mid-term acceptance (villa construction time is relatively long), can be divided into two, the first acceptance involves ceilings, water circuits, wood products and other items, the second acceptance is specifically for home improvement Use a waterproof room for inspection. If you find a problem or want to make some partial changes, it is best to present it in this stage in a timely manner.

Circuit modification: When the circuit is checked, it must be noted whether the wire used is the designated brand and whether the wire is up to standard. The non-compliance of wires has the condition of thin blister cores or coarse copper cores. These two non-compliant wires have an impact on the current load, which leads to potential safety problems for the owners in future use. When checking the circuit modification, check the closed condition of the socket. If the original socket has been displaced, carry out moisture-proof and waterproof treatment at the shifting position, and apply a waterproof tape over 3 layers for sealing. Also check that the circuit joints in the ceiling are also treated with waterproof tape. Decoration first net

Waterway reconstruction: The test of the waterway reform is mainly to conduct pressure test. When the pressure is applied, the pressure should not be less than 6kg. The pressure can not be less than 15 minutes. Then check whether the pressure gauge has pressure relief. If there is pressure relief, check the valve. Closed, if there is a pipe leak problem to be processed before the next construction.

Waterproof: Generally, the room where the floor drain is installed should be waterproofed. The waterproofness not only affects the daily life of the owner, but also affects the interests of the neighbors downstairs. Closed water test is a common method for testing waterproofing in home improvement. When conducting a closed water test, the foreman needs to confirm the closed time with both the owner and the downstairs occupant, and then close the drain hole of the room to put water into the room (water level Not less than 3cm), after 24 hours to check or ask if there is leakage in the downstairs household.

Acceptance shower wall waterproof when you can first check the wall paint is uniform, there is no leakage brush phenomenon, in particular, check the yin and yang angle whether there is a leak brush, to avoid the yin and yang angle due to leaking brush waterproof coating and cause dampness and mildew. The waterproof height of the shower wall is usually about 1.8m, and the wall waterproof of other areas should be higher than 1.5m.

The ultimate off

Acceptance of meticulous acceptance

Completion acceptance is the final pass of acceptance of the home improvement project. The supervision engineer reminds consumers that all the details agreed in the contract or not agreed upon are found in a timely manner and should be meticulous as far as possible. If there is a lack of understanding of home improvement projects, consumers can also ask professional or third-party acceptance agencies to assist in acceptance.

Acceptance of doors and windows: should pay attention to whether the doors and windows open properly, whether the doors and windows are closely bonded to the wall, whether the gap is appropriate, generally 0.5 cm is preferred.

Bricklayer acceptance: should pay attention to whether there is tilt on the ground; whether the gaps in the brick surface are regular and consistent; whether there are enough drainage slopes on the floors with floor drains such as toilets and balconies; whether the brick surface has broken and collapsed angles. Test wall tile whether there is empty drum can be used hammer hit the wall surface, such as sound empty wall drum phenomenon exists, according to Beijing family room decoration project quality acceptance standards, 100 wall hollow drum wall tile should not exceed 5 pieces. Decoration first net

Paint acceptance: You can touch the wall with your hand and feel that the paint is smooth, soft, smooth and clean without particles. The wall should have no emptying, blistering, cracking, and no stains.

Acceptance of woodworking: mainly depends on whether the structure is straight, whether the corner is accurate, whether the parquet is tight, whether the arc and roundness are smooth, whether the cabinet door switch is normal or not, whether the ceiling corner line connection has obvious unevenness and distortion. Whether the line is straight and accurate, and whether the ceilings of toilets and kitchens, such as aluminum buckles and PVC buckles, are flat and deformed, and whether the door handle locks are installed in the correct position and whether the opening is normal.

Miscellaneous acceptance: In accordance with the provisions of the contract item, the project shall be audited item by item to check whether all the lamps and lanterns are properly illuminated, whether the project garbage has been completely removed, whether the sanitary fixtures and other installation products are installed accurately, and the toilets include water storage and flushing. Wash basin drainage is normal.

Links: summer rainy season decoration key moisture-proof must-know four discipline three attention
Acceptance skills of fine decoration house hidden works need more careful

Construction Acceptance Entrance Decoration Children's Room Decoration Home Improvement Paint Room Window Coating Villa Door Kitchen Door Kitchen Wall Tile Door Villa Door & Window Decoration Home Tile Tiles Tiles Cottage Villa Area Balcony Tile Kitchen Tile Decoration Home

Wood Screws

Stainless Steel Wood Screws ,Black Wood Screws,Wood To Metal Screws,Self Tapping Wood Screws

Kunshan Zhonggu Precision Hardware Co., Ltd. , https://www.zgfastener.com