Array infrared smart high-speed ball operation

The method and key details of using the **array infrared intelligent high-speed ball** make it easy and efficient to operate. Following the correct procedure ensures smooth performance, reduces the risk of damage, and extends the lifespan of your device. Step 1: Once you receive your smart speed dome, handle it with care throughout the entire process. Treating it gently will ensure better performance, fewer malfunctions, and a longer operational life. Step 2: Many people tend to lift the core of the intelligent high-speed ball during installation. However, the core is connected directly to the conductive slip ring interface, and improper handling can cause poor connections. It's best to lift the entire smart speed dome instead, avoiding any damage to internal components. Step 3: During installation, make sure the power cable is placed close to the intelligent high-speed ball. Avoid extending the power adapter cable or using centralized power supply. Centralized power can lead to voltage drops, especially during thunderstorms, when resistance increases. This may result in insufficient power, potentially damaging the motherboard and causing control failure. Step 4: When wiring, always distinguish between the RS485 communication line and the power line. Connecting RS485 to the power source can immediately damage the intelligent high-speed ball. Clearly label all cables for easier future maintenance. Step 5: When installing, bring the 220V power line directly to the dome. Do not extend the power adapter cable or use a centralized power system. Extending the line or using shared power can cause voltage drops, especially on rainy days when resistance increases. This may lead to insufficient power, causing the main control board to discharge continuously and possibly burn out the dome. Step 6: Installing the smart speed dome indoors is different from outdoor installation. If installed outdoors, waterproofing is essential. Unless you have professional experience, it’s not recommended to install it outside. Even if you seal it with glass glue, there may still be small gaps that allow water to seep in, which can severely impact the performance of the high-speed ball. Step 7: Testing the smart speed dome is crucial. Always use the correct power source. Too much voltage can burn the device, while too little may not meet the required power level, leading to continuous discharge of the main control board. This can damage internal components and reduce the lifespan of the device. Step 8: After completing the above steps, the installation process should be nearly complete. Take a moment to double-check everything to ensure no mistakes were made. A careful review helps avoid future issues and guarantees optimal performance. By following these steps carefully, you’ll ensure a reliable and long-lasting operation of your **array infrared intelligent high-speed ball**.

Laminated Glass

Laminated Glass,Laminated Glass Window,Pvb Laminated Glass,Tempered Glass Windows

Huaian Hongrui Glass Co.,Ltd , https://www.hongruiglass.com